22 - 24 Street No. 5, Sala City, Thu Duc, Ho Chi Minh City

Hotline: 0837977978

Facebook

Severe Traffic Congestion from An Phu Interchange to Ho Chi Minh City - Dau Giay Expressway

    An Phu Interchange: A Major Traffic Hotspot

    At An Phu Interchange, traffic congestion has become increasingly severe, especially along Mai Chi Tho Boulevard leading to the Ho Chi Minh City - Long Thanh - Dau Giay Expressway. Vehicles including trucks, containers, and private cars form long lines stretching for kilometers without moving. Many drivers were forced to turn off their engines and wait under the scorching sun, while traffic police were present at key junctions to direct traffic, but the situation saw little improvement.

    Heavy congestion at An Phu interchange.
    Heavy congestion at An Phu interchange.

    According to driver Nguyen Van Tam (from Long Hai Ward, HCMC), it took him over an hour to move just 1 kilometer. In front of him was a seemingly endless line of vehicles, with no exit in sight. Despite the presence of traffic police to manage lanes, congestion showed no signs of easing.

    Vehicle lines backed up on HCMC - Long Thanh - Dau Giay Expressway.
    Vehicle lines backed up on HCMC - Long Thanh - Dau Giay Expressway.

     


    Main Cause of the Traffic Jam

    The HCMC - Long Thanh - Dau Giay Expressway, stretching 55 kilometers, is a vital artery connecting Ho Chi Minh City to the Southeast region. However, in recent years, the vehicle volume has surged beyond the expressway’s capacity. In particular, the section from An Phu Interchange to Bien Hoa - Vung Tau Expressway is operating at over 125% of its original design capacity. This overload has led to prolonged traffic jams, especially during peak hours.

    Traffic gridlock at An Phu lasts for hours.
    Traffic gridlock at An Phu lasts for hours.

     


    Infrastructure Expansion Plans & Solutions

    To resolve the issue, the Vietnam Expressway Corporation (VEC) plans to begin expanding the 21-km section of the HCMC - Long Thanh Expressway starting August 19, 2025. The project is expected to cost over VND 15,700 billion and aims to be completed by 2026, reducing overload on the current route.

    In addition, the HCMC Department of Construction has approved a VND 900 billion project to expand the roadway from An Phu Interchange to Ring Road 2. This strategic project is expected to ease congestion in Eastern HCMC and provide a long-term traffic solution.


    Outlook and Future Prospects

    The congestion at An Phu Interchange clearly illustrates that HCMC’s transportation infrastructure is reaching its limits. However, with upcoming expansion projects on both the expressway and Ring Road 2, there’s hope for easing congestion, improving traffic flow, and making commuting between HCMC and nearby provinces more efficient in the near future.


    Contact Information & Consultation

    📌 Project name: Vinhomes Green City
    📞 Hotline: 0837 977 978
    📍 Sales Office: 22 - 24 Street No. 5, Sala City, Thu Duc City, HCMC
    📧 Email: trunghieu1993.hcm@gmail.com
    🌐 Website: https://batdongsanhochiminh.com.vn

    Related articles

    Vingroup Stock Hits Ceiling, Billionaire Pham Nhat Vuong’s Wealth Reaches Record High

    VIC stock surged to its ceiling price of VND 101,600, boosting billionaire Pham Nhat Vuong’s net worth to nearly USD 11 billion. The Vinhomes Green Paradise mega project in Can Gio has emerged as a new growth driver for Vingroup and the Vietnam stock market in 2025.

    HCMC Allocates Nearly VND 19,400 Billion to Extend Vo Van Kiet Boulevard – Major Infrastructure Boost for the Western Zone – Golden Opportunity for Investors Targeting Vinhomes Green City

    Ho Chi Minh City has approved an investment of nearly VND 19,400 billion to extend Vo Van Kiet Boulevard by an additional 14.6 km to Long An Province, paving the way for a breakthrough in real estate development in the western area – especially at Vinhomes Green City, the new connectivity hub.

    Youtube
    Tiktok
    Fanpage
    Hotline
    Liên hệ zalo