Vinhomes Green City is becoming a standout investment highlight in Western Ho Chi Minh City as the Vo Van Kiet Boulevard extension to Long An is set to begin, backed by nearly VND 19,400 billion. This infrastructure breakthrough will shorten inter-regional connectivity, providing a powerful boost to property values in the area—especially for master-planned mega-urban projects like Vinhomes Green City.
Key Arterial Road to Expand the Southern Key Economic Zone
According to a report by the HCMC Department of Construction, the extended road will stretch approximately 14.6 km, starting from the National Highway 1 flyover (Vo Van Kiet – Binh Chanh District) and ending at the border with Long An Province, which overlaps with the starting point of the DT.823D project—a vital connector in the regional development plan.
Vo Van Kiet Boulevard extension route toward Long An
The project is divided into three main segments:
-
Segment 1: From National Highway 1 flyover to Tan Tao – Cho Dem road (2.7 km), previously developed under a BOT model but now set to be completed with public funding.
-
Segment 2: From Tan Tao – Cho Dem road to Ring Road 3 (6.6 km), including an interchange between the two routes.
-
Segment 3: From Ring Road 3 to Long An border (5.3 km), creating a strategic route toward the Southwest region.
The road will be built to urban arterial standards, with a speed limit of 80 km/h for vehicles and 60 km/h for mixed-use lanes. It will be 60 meters wide, accommodating 6–10 lanes, and will include bridges over rivers such as Cai Trung, Hung Nhon, An Ha, and more.
Nearly VND 19,400 Billion Investment – Infrastructure Opens New Horizons for Real Estate
The estimated total investment is close to VND 19,400 billion, with land clearance costs accounting for VND 12,875 billion, construction costs around VND 3,769 billion, and the remainder allocated to consulting and contingency expenses.
Vo Van Kiet Boulevard—part of the East-West Axis—currently stretches about 13 km and has been operational since 2009, playing a key role in connecting HCMC to the East and South. The planned extension westward toward Long An is part of a long-term strategy to enhance regional connectivity and promote sustainable urban and economic development.
Vinhomes Green City – Key Beneficiary of This Major Infrastructure Upgrade
The Vo Van Kiet expansion will significantly reduce travel time between central Ho Chi Minh City and Vinhomes Green City, a master-planned green mega-urban area at the gateway to Long An, located just under 30 minutes from the city center.
Vinhomes Green City holds a strategic position at the heart of the “Golden Economic Triangle”: HCMC – Long An – Tay Ninh
With this prime location, Vinhomes Green City directly benefits from a series of major infrastructure projects including Ring Road 3, Ring Road 4, Metro Line 2, the HCMC – Moc Bai Expressway, and now the Vo Van Kiet Boulevard extension.
Conclusion: Breakthrough Opportunity for Western HCMC and Long An Real Estate
The Vo Van Kiet Boulevard expansion marks a milestone in Ho Chi Minh City’s strategy to strengthen inter-regional connectivity between 2025 and 2030. The completion of this route not only catalyzes development in the Southwest region, but also ushers in a new era for mega-urban zones like Vinhomes Green City, which is leading the movement toward a greener, more connected, and prosperous lifestyle in the high-potential land of Long An.
Contact Information & Detailed Consultation
📌 Project Name: Vinhomes Green City
📞 Direct Consultation Hotline: 0837 977 978
📍 Sales Office: 22 - 24, Street No. 5, Sala City, Thu Duc City, Ho Chi Minh City
📧 Email: trunghieu1993.hcm@gmail.com
🌐 Website: https://batdongsanhochiminh.com.vn